Get In Touch
66, Apokoronou Street, 73134, Chania, Crete, Greece.

Ph: +302821112777
Work Inquiries
Back

Building Permits in Greece: Steps, Costs, and Common Pitfalls.

When planning any construction, whether it’s a residential home, commercial building, or renovation, obtaining a building permit in Greece is mandatory. 

Embarking on a construction project in Greece requires careful planning and adherence to local regulations. A crucial aspect of this process is obtaining a building permit. This comprehensive guide will delve into the intricacies of securing a building permit in Greece, outlining the steps involved, potential costs, and common pitfalls to avoid.

Understanding Building Permits in Greece

A building permit is a government authorization that allows you to commence construction, renovate, or alter a property. In Greece, a building permit is mandatory for any project, regardless of its scale. The permit ensures compliance with zoning laws, building codes, and environmental regulations.

Building Works Requiring Permits

A building permit is necessary for the following construction activities:

  • Construction, Additions, and Repairs: Creating new buildings, extending existing structures, or making significant repairs.
  • Demolition: Destroying structures, except in specific cases.
  • Excavation and Backfill: Earthworks exceeding 0.80 meters in depth, as well as site preparation.
  • Pool Construction: Building swimming pools.
  • Change of Use: Altering the intended purpose of a building, especially if it involves structural changes or increased load.
  • Retaining Walls, Fences, and Surrounding Walls: Construction of these elements beyond the scope of small-scale construction.
  • Underground Tanks: Building tanks for storage of liquids or gases.
  • Underground Fuel Tanks: Installing tanks at service stations.
  • Works Over €25,000: Projects with a budget exceeding this amount require a permit.
  • Legalization of Unauthorized Works: Regularizing any construction undertaken without a permit.

Categorization of Building Permits in Greece

Building permits are classified into three categories based on the project’s location, size, and environmental impact:

Category 1:

  • Construction of large-scale buildings within or outside city plans.
  • Additions to special-use buildings exceeding 50% of the existing structure.
  • Projects in protected areas, historical sites, or near water bodies.

Category 2:

  • Construction in settlements without approved boundaries.
  • Legalization of buildings and changes of use.
  • Projects requiring on-site inspection by the City Planning Agency.

Category 3:

  • Construction of smaller buildings within city plans.
  • Residential construction in areas with cadastral registration and approved plans.
  • Additions to residential buildings.
  • Changes of use for residential buildings.
  • Pool construction, subject to certain conditions.
  • Retaining walls, fences, and surrounding walls within specific parameters.
  • Underground tank installation.
  • Repair and layout changes for existing buildings.
  • Works under €25,000.

Small Scale Permit

The Small Scale Permit is a form of building permit that concerns smaller works than the building permit and is also faster and cheaper to issue. The key condition for the issuance of a small-scale permit is that the property respects urban planning provisions.

Types of Small-Scale Construction Works

Small-scale construction works include:

  • Construction of retaining walls, surrounding walls and fences;
  • Construction of small structures, such as gazebos, sheds, and pergolas;
  • Installation of satellite dishes and antennas;
  • Construction of swimming pools that do not exceed 25 square meters in surface area;
  • Painting and decoration of buildings;
  • Replacement of windows and doors;
  • Minor repairs to buildings;
  • Construction of small-scale solar power systems;
  • Landscaping and gardening.

Requirements for Obtaining a Small-Scale Permit

To obtain a small-scale permit, you will need to submit the following documents:

  • Application form
  • Property ownership documents
  • Site plan
  • Proposed construction plans
  • Proof of payment of fees

The fees for a small-scale permit are typically lower than the fees for a full building permit.

Process for Obtaining a Small-Scale Permit

The process for obtaining a small-scale permit is typically faster and simpler than the process for obtaining a full building permit. However, it is still important to submit a complete and accurate application to avoid delays.

Once you have submitted your application, the local authorities will review it to ensure that it complies with all applicable laws and regulations. If your application is approved, you will be issued a small-scale permit.

Benefits of Obtaining a Small-Scale Permit

There are several benefits to obtaining a small-scale permit, including:

  • Faster turnaround time
  • Lower costs
  • Simpler process

If you are planning to undertake a small-scale construction project, it is important to determine whether you need a small-scale permit or a full building permit. You can contact your local municipality for more information.

Duration and Validity of Building Permits in Greece

The duration and validity of building permits in Greece vary depending on the type of project.

Building permits for larger buildings such as hotels are valid for 6 years.

For Small-scale work projects, building permits have a one-year duration.  

Building permits for building demolition projects have a duration of 6 months.

In certain cases, building permits may be extended if the necessary conditions are met by the legislation.

Additional Information
  • Building permits for smaller projects, known as “small-scale construction works,” typically have a shorter duration.
  • The specific duration of a building permit may also depend on the location of the project and other factors.
  • It is important to consult with local authorities or a qualified professional to determine the exact duration of validity for a specific building permit.

Key Points

  • Building permits in Greece have varying durations depending on the project type.
  • Larger buildings have longer validity periods. Smaller projects and building demolition permits have shorter durations.
  • Extensions may be possible in certain cases.

Additional Resources

Who Can Issue a Building Permit in Greece?

Building permits in Greece are exclusively issued by civil engineers. These professionals are qualified to assess construction projects, ensure compliance with regulations, and authorize building work. Civil engineers possess the necessary expertise in structural engineering, architectural design, and construction management to evaluate the feasibility and safety of proposed projects.

The Role of Civil Engineers in Building Permits

Civil engineers play a pivotal role in the building permit process:

  • Technical Expertise: They provide technical assessments of project plans, ensuring they meet structural, architectural, and safety standards.
  • Regulatory Compliance: Civil engineers verify that projects adhere to zoning laws, building codes, and environmental regulations.
  • Permit Application: They prepare and submit comprehensive permit applications to the relevant authorities.
  • Project Oversight: Civil engineers may also supervise construction work to ensure adherence to permit conditions and quality standards.

dedicated to your needs!

Key Steps to Obtain a Building Permit

  1. Preliminary Research and Planning:
    • Identify Local Authorities: Determine the relevant municipality or planning department responsible for issuing permits in your area.
    • Gather Property Information: Collect essential details about your property, including land ownership documents, zoning classification, and existing structures.
    • Consult Professionals: Engage an architect or engineer to prepare detailed plans and specifications that adhere to local standards.
  2. Submit Application and Required Documents:
    • Complete Application Forms: Provide accurate information on the proposed project, including its purpose, scope, and materials.
    • Attach Supporting Documents: Submit architectural plans, site plans, structural calculations, and any other required documentation.
    • Pay Application Fees: Ensure that you include the necessary fees as specified by the local authorities.
  3. Review and Approval Process:
    • Municipal Evaluation: The local authorities will review your application and accompanying documents to assess regulation compliance.
    • Potential Revisions: You may be requested to make revisions or provide additional information if your application is incomplete or non-compliant.
    • Approval or Denial: Once the review is complete, you will receive a decision regarding the approval or denial of your building permit.
  4. Construction Commencement:
    • Permit Issuance: Upon approval, you will be issued a building permit, which authorizes you to proceed with construction.
    • Adhere to Permit Conditions: Ensure that your construction activities strictly follow the terms and conditions outlined in the permit.

Factors Affecting Permit Costs

The cost of obtaining a building permit in Greece can vary depending on several factors:

The cost of obtaining a building permit in Greece can vary significantly based on multiple factors, including the type of project and its specific requirements. Below are the key elements that influence permit costs:

  1. Project Size and Complexity: Larger or more complex projects, such as multi-story buildings, commercial developments, or structures with intricate designs, often demand detailed architectural and engineering plans. These projects require more thorough reviews by municipal authorities, resulting in higher permit fees due to the additional time and resources needed for approval.
  2. Location and Zoning Regulations: Building permits in urban areas, especially in high-demand regions or prime real estate locations like Athens, Thessaloniki, or popular tourist destinations such as Crete, typically cost more. This is due to higher property values, stricter zoning laws, and more rigorous planning approvals. Additionally, building in zones designated for tourism or coastal regions may require special permits, which could further increase costs.
  3. Specific Project Requirements: Projects that involve historical preservation, are located near archaeological sites, or are in environmentally protected areas (such as Natura 2000 zones) often incur additional fees for specialized studies or assessments. These may include environmental impact assessments (EIAs), heritage conservation reports, or seismic stability analyses, depending on the site’s characteristics and the project’s potential impact on its surroundings.
  4. Energy Efficiency and Sustainability Standards: With Greece’s increasing focus on sustainability, projects aiming to meet energy efficiency regulations, such as those targeting certification under EU energy directives or aiming for a Net Zero or LEED certification, may require extra documentation and higher permit fees. The need for compliance with energy-saving building standards, renewable energy installations, or bioclimatic design elements can drive up both the complexity of the process and the associated costs.
  5. Time Sensitivity and Expedited Processes: In some cases, clients may require expedited processing of their permits to meet tight construction timelines. Fast-tracking a permit may result in additional costs, as municipalities may charge premium fees for prioritizing the review and approval process.
Passive House Design in Crete.

As architects, thinkers and designers, we are always pushing the bounds of current innovation to build a more sustainable tomorrow in Crete, Greece.

Living in a Passive House means living in a space with the highest standards of energy efficiency, comfort, health and wellbeing. Opposing other sustainable building approaches, Passive House is a performance-based standard that directly and precisely addresses the problem of energy use.

Learn more.

Common Pitfalls to Avoid

Common Pitfalls to Avoid

Navigating the building permit process in Greece can be complex, and several common pitfalls can lead to costly delays, penalties, or even legal challenges. Below are the most critical issues to avoid when seeking a building permit:

Unauthorized Construction:
Starting construction without obtaining the proper permits is one of the most serious mistakes. Engaging in unauthorized construction can result in heavy fines, legal disputes, or even a demolition order. In Greece, building permits are strictly enforced, and any violations are subject to penalties that can significantly exceed the original permit costs. To avoid these consequences, ensure that all necessary permits are in place before breaking ground.

Incomplete or Incorrect Documentation:
The permit application process requires the submission of various documents, such as architectural plans, environmental assessments, and engineering reports. Submitting incomplete or inaccurate documents can cause your application to be delayed or rejected. It is essential to double-check all submissions to ensure that they meet municipal requirements and are submitted within the required timeframes. Missing documents or errors may lead to lengthy approval delays, increasing project costs.

Non-Compliance with Zoning and Building Regulations:
Failure to comply with local zoning laws, building codes, and environmental standards can cause significant setbacks. These regulations are often complex and vary depending on the project’s location. For instance, certain areas may have restrictions related to building height, plot coverage, or preservation of natural and historical sites. Be sure to thoroughly review and understand the applicable regulations for your project to avoid any non-compliance issues, which could result in fines, mandatory changes to the project, or even permit cancellation.

Ignoring Environmental and Historical Preservation Requirements:
In Greece, many areas are subject to stringent environmental or historical preservation laws. Projects located near protected areas, such as Natura 2000 zones or archaeological sites, must undergo additional review processes. Failing to account for these requirements can cause severe delays, increased costs, and potential legal complications. Engaging with specialists, such as environmental consultants or historians, early in the process can help navigate these challenges effectively.

Delays and Revisions:
The building permit approval process can often take longer than anticipated, especially for large or complex projects. Unforeseen delays may occur due to the need for revisions in the submitted plans or additional requests from the review committee. It is crucial to be proactive in addressing any issues that arise and to respond to revision requests promptly. Failing to do so can stall your project and incur additional fees.

Underestimating Permit Costs and Fees:
Some developers underestimate the total costs associated with obtaining permits, including administrative fees, taxes, and required assessments. This oversight can result in budget shortfalls and delays in project timelines. Ensure that you account for all potential costs, including unforeseen fees, in your project planning to avoid financial strain.

INCONDE Team
https://inconde.com

This website stores cookies on your computer. Cookie Policy